|
|
 |
LANDSCAPE CONSTRUCTION FACTS:
- Modular Stone Walls – in all 1,150 square feet (33 pallets)
a.) Two walls that are 5 feet (including base) by 100 feet in length along back property line
b.) One wall to suppot the back
c.) One wall in front to support the entry sidewalk
- Paver Patio – 575 square feet (6 pallets)
- Installed outdoor fire place
- Installed an outdoor kitchen
- Buried all downspouts (300 linear feet)
- Installed irrigation system for turf areas
- Graded for proper drainage
- Installed plant material
- Installed annual flowers
|
|
Time it would take in a normal situation: 900 man hours or 30 days ( Done in 3 days)
|
|
|